Jinqiang MachineryPhone/WhatsAppService Phone:  +8619870423316

WeChat/WhatsApp:+8619870423316
Phone/WhatsAppService Phone:+8619870423316

current location: home > News and information > Reselection of knowledge

On site installation method for spiral chutes

update date:2023-07-20 03:49:37Number of views: author:huang

On site installation method for spiral chutes

On site installation method 1 for spiral chutes describes that gravity separation is widely used in the beneficiation of metal and non-ferrous metals due to its low pollution and low cost. The fiberglass spiral chute is one of the gravity beneficiation machinery, with a structural feature of a cubic parabolic cross-section. It is used to handle finer particle sizes of -0.2mm, and does not require flushing water in the sorting process. The tail part of the chute is selected in sections to select fine, medium, and tailings. 2、 The production principle is the same: the slurry is slowly fed to the rotating groove surface through the feeding chute at the head end of the spiral groove for sorting. The bottom of the spiral groove is equipped with a valve block type product acquisition groove, and the sorting equipment is divided into three types according to grade along the radial direction. Change the cutting width of each product by adjusting the orientation of the valve block, and gather the selected multi-directional mineral flow through the equipment gathering hopper. The slope change of the cross-section and curve of the fiberglass chute is very suitable for the selection of fine particle materials. Method 3 for on-site installation of the 螺旋溜槽现场安装方法 spiral chute. Advantages and characteristics: 1. Stable, easy to control, and with a relatively large concentration range. 2. The production and processing capacity of mineral materials is strong, with high enrichment and high recovery rate. 3. It takes up little space, consumes little water, has a simple structure, and does not require power. 4. Installation is simple, easy to operate, with minimal investment and fast efficiency recovery. On site installation method for spiral chute: 螺旋溜槽现场安装方法 4. Structural composition: The fiberglass chute is composed of six parts: a feeding homogenizer, a feeding chute, a spiral groove, a product acquisition groove, an equipment gathering hopper, and a groove bracket (including a cross or triangular frame). The rotating groove connected by spiral blades is the main component. The rotating plate is made of fiberglass (fiber reinforced coal gangue) and connected together through screws. The selected surface of the spiral groove has a pre made durable wear-resistant layer. It also has the advantages of lightweight, sturdy, and long-lasting consumables. The rotating groove is equipped with a multi tube feeding homogenizer for ore separation, which is simple and convenient to control. The mineral screening device does not need to be placed on a cross (or tripod) on a support table. The evenly distributed slurry is slowly fed to the rotating groove surface through the feeding groove installed at the end of the spiral groove head, and sorting is carried out. The tail end of the spiral groove is equipped with a valve type new product selection groove, which allows other new products to be divided into three types (or four types) of new equipment along the radial direction according to grade. Change the selection width of each new product by adjusting the orientation of the valve block. The new product gathering bucket is a concentric circular tube that densely exports the intercepted variable mineral flows. The transverse surface of the fiberglass spiral chute has different slopes, which is very suitable for the separation of fine particle materials. 5、 The fiberglass spiral chute is suitable for processing 0.6-0.03mm and vein and placer ores, but it is unfavorable for sorting when the mud content is high. It is now widely used for processing iron ore, tungsten, tin, niobium tantalum ore, coastal and river sand, and placer gold, among others. Installation Method for Spiral Chute on Site 螺旋溜槽现场安装方法 Installation Method for Spiral Chute on Site

On site installation method for spiral chutes
Product Center
Phone/WhatsApp:+8619870423316